The renovated interior work environments are intentionally open and fluid, consistent with a culture predicated on change, innovation and shared ideas. Spaces are organized along the back end of the facility, allowing the tall glass perimeter to provide natural daylight to work areas. A wood-clad zipper ceiling visually unifies varied work environments in the wedge and renovation area.
This challenging and innovative design-build project met an aggressive delivery schedule, a difficult site, and a tight project budget on time and under budget, without disrupting a fully functioning manufacturing plant.
Building information models and augmented/virtual reality (AR/VR) technology helped convey aspects of the design that may have been considered abstract, allowing the client to make timely decisions and preventing schedule disruption.