A new foam production line (FM3) was designed by the client and integrated by our team.
The line is 225 feet long, from unwinder to rewinder. It includes molten salt evaporation and recovery systems and a sludge processing system.
Our work included the integration and installation of irradiation and foam line equipment for the 27,300-square-foot expansion.