Liquefied Natural Gas (LNG) Peak Shaving
- Home
- Services
- Electric Power Generation
- Natural Gas Generation
- Liquefied Natural Gas (LNG) Peak Shaving
- Water
- Design-Build for Water & Wastewater Infrastructure
- Green Infrastructure
- Industrial Water & Wastewater
- Master Planning for Water & Wastewater Utilities
- Municipal Water & Wastewater
- Smart Infrastructure
- Wastewater & Stormwater Collection
- Water & Wastewater Program Management
- Water Supply & Distribution
- Transportation
- Telecommunications
- Industrial, Manufacturing & Optimization
- Mining Infrastructure
- Federal & Military
- Environmental
- Electric Power Generation
- Electrical Transmission & Distribution
- Aviation
- Architecture
- Commissioning
- Construction
- Buildings
- Oil, Gas & Chemicals
- Program Management
- Water
- Design-Build for Water & Wastewater Infrastructure
- Green Infrastructure
- Industrial Water & Wastewater
- Master Planning for Water & Wastewater Utilities
- Municipal Water & Wastewater
- Smart Infrastructure
- Wastewater & Stormwater Collection
- Water & Wastewater Program Management
- Water Supply & Distribution
- Transportation
- Telecommunications
- Industrial, Manufacturing & Optimization
- Mining Infrastructure
- Federal & Military
- Environmental
- Electric Power Generation
- Electrical Transmission & Distribution
- Aviation
- Architecture
- Commissioning
- Construction
- Buildings
- Oil, Gas & Chemicals
- Program Management
The demand for natural gas has risen, leading industries to turn their focus to liquefied natural gas (LNG) for peak-shaving local demand curves, supplying remote locations with energy and supporting areas looking to avoid new natural gas pipelines.
We can integrate LNG into your existing facilities or improve the effectiveness of new operations. Combined with our experience with liquefaction, gas transmission, transport pipelines and processing solutions for terminal facilities, we can help you navigate the key steps in every project phase.
LNG and Peak Shaving
Storing LNG can help meet demand in peak seasons by liquefying when gas prices are down and vaporizing when natural gas is most needed. Our staff has system planning, design and construction management experience with LNG peak-shaving facilities, including studies on whether your facility requires a bullet tank or a single, double or full containment tank.
We understand the challenges of market demand and can design and deliver facilities with the speed and agility to help you ramp up when peak shaving is needed.
Success Through All Project Phases
Our full-service, multidisciplinary solutions cover conceptual design and preliminary engineering through engineer-procure-construct (EPC) services and on to facility commissioning and startup. We can self-perform steel and pipe fabrication and have direct-hire construction capabilities to remove uncertainty from your project. By integrating construction teams early in the project, we achieve more seamless transitions between project phases.
Our in-house capabilities cover all needs for environmental permitting, routing, design and construction, helping to select the appropriate technologies, assess financial impacts and address operational changes. We have provided services ranging from feasibility studies to land surveys to stormwater pollution prevention plans and wetland impact documentation. Our scope has included detailed design of all balance-of-plant systems, as well as procurement of equipment.
We also bring experience in reliability improvement projects, including equipment upgrades, plant drawings and procedure updates. Our understanding of the LNG vaporization process, combined with our experience in combustion turbine designs, provides a complete solution for fuel system modifications.