Environmental




Focused on Safety, Purpose and Integrity

A project's environmental impacts can be daunting and complex. Navigate permitting compliance, remediation, studies, design and construction challenges with confidence.

What We Do

What We Do

Projects

  • Greentown-Reynolds 765-kV Transmission Line

    Greenfield routing, communications and environmental permitting services for a 70-mile 765-kV transmission line in Indiana within the MISO system.

  • Richland Creek Mitigation Bank

    Establishment of a stream mitigation bank in Kentucky to help restore and rehabilitate perennial, intermittent and ephemeral streams within a watershed.

  • 2D Stormwater Modeling

    Development of 55 2D subwatershed models for the city of Lawrence, Kansas, reflecting different types of stormwater system and land use.

  • MGP Site Remediation

    Remediation services including a comprehensive high-resolution site characterization of a former manufactured gas plant (MGP) site and adjacent property.

  • Puzzle Creek Conservation Bank

    Establishment of a conservation bank in California to help mitigate losses of Joshua trees and desert streams in the Mojave Desert.

  • Chariton Hills Conservation Bank

    Development of a conservation bank to help protect endangered bats and compensate for expected adverse habitat impacts in nearby ecosystems.

  • MS4 Compliance Support & Stormwater Analysis

    Assistance and coordination for MS4 compliance for the City of Grandview, Missouri, as well as evaluation and updating of the city’s stormwater management ...

  • Park Creek Station Wetland Mitigation Bank

    Development of a mitigation bank to preserve, restore and create wetlands in advance of adverse impacts to wetlands and aquatic resources nearby.

  • Eagle Protection and Offset Program (EPOP)

    Development of a national Eagle Protection and Offset Program to streamline mitigation efforts required by Eagle Incidental Take Permits (EITPs).

  • Buck O’Neil Bridge Replacement Design-Build

    Owner’s engineer services for the design-build replacement of the John Jordan “Buck” O’Neil Memorial Bridge, including a PEL study and environmental assessment.

  • North Fork Crow River Mitigation Bank

    Establishment of a wetland mitigation bank to provide credits to offset wetland impacts from development north and west of the Twin Cities area.

  • Moosa Creek Riparian Restoration

    Restoration of an abandoned golf course near Marine Corps Air Station (MCAS) Camp Pendleton, near San Diego, to transform it into a protected riparian ...

  • Power Plant Carbon Storage

    Front-end engineering design (FEED) services for a carbon storage initiative at a coal-fired power plant.

  • Direct Air Capture (DAC) Hub

    Phased development and FEED services for a direct air capture (DAC) hub in Louisiana.

  • Class VI Injection Well Permitting

    Support for a Class VI Underground Injection Control (UIC) program for a multiwell carbon dioxide (CO2) injection facility for permanent geologic storage.

  • Zero Waste Plan

    Development of a zero waste plan to address a range of city sectors and prioritize strategies to increase recycled and composted material quantities.

  • CCS Geological Siting Study

    Feasibility evaluation for capture and injection of carbon dioxide (CO2) generated from biofuel production into geologic formations for long-term sequestration.

  • KC Streetcar

    Multidisciplinary design services for water, utility and road infrastructure related to implementation of a new streetcar system, followed by studies and ...

  • Big Canyon Treatment Wetland & Restoration

    Integrated design for a constructed wetland to treat dry and wet weather flows, reduce stormwater runoff, restore degraded habitat and improve water quality in ...

  • Energía Sierra Juárez Wind Farm

Insights & News

Blog

Decoding EPA’s Compliance Changes for PFAS

PFAS, PFOS and their salts are now on the EPA’s “List of Lists”. This change imp...

Case Study

Strategic Solutions Drive Enhanced Power Reliability at Mississippi River Crossing

To boost power supply reliability for one of its utility co-ops in Missouri, Wab...

Service Feature

Capital Program Readiness Assessment: Know Before It's Too Late

Blog

What the Renewed MS4 Permit Means for Texas Municipalities

News

Burns & McDonnell Announces Promotions in the Mountain Region to Support Design and Construction of Critical Infrastructure Projects